Thursday, April 12, 2012
My morning with the bees
They are here, finally. After two years of having my beekeeping supplies and hive, they are here. The first year I didn't realize that you really needed to order bees before Christmas for the next spring season. So, I was a bit late getting started, considering it was almost May. I breathed a silent sigh of relief. "Bees, am I crazy?" Last year I knew we were going to be selling our house and building, so I really didn't want to start another hobby. But, I was able to attend last month's beekeeping meeting and made some connections. There was a lady who had lost her hive to starvation and had found an apiary who still had bee packages in late March. Apparently, that was rare. Packages include the queen and a couple thousand other bees. I ran home after the meeting and looked up their website. Next morning, I called first thing and by the end of our 45 minute conversation, I had ordered 4 lbs. of Italian honeybees. I knew it was now or never. Bring on the bees.
Last weekend, I pulled out all of my supplies at the house and realized I was missing a key box of supplies. Basically, everything. Crap. I couldn't remember if it was in my mother's attic, my mother in law's attic, or one of three storage units. (The worst part of this move is not knowing where anything is!) I finally located it on Tuesday in a storage unit and had the boys help me put the frames in the supers. The apiary called on Tuesday night and told me to expect them on Friday. But, I had a feeling I needed to be ready. Like nesting for a new baby, I gathered my cinder blocks, bought 4 lbs. of sugar to make their syrup and positioned the hive just right. (Facing south-east with a view of the sunset, wind break of trees behind, lightly bathed in dappled light). This morning, I got the call to pick them up. I was so excited and Milo asked if he would be able to help in the clothes he was wearing. Yesterday I gave them a speel about wearing the right protective clothing and not wear dark colors and he wanted to help today! Their little beekeeper suits are coming soon, I promised them. I picked the bees up at the post office and the clerks were very nice about having them there. I drove them home slowly and placed them by their hive while I made the sugar syrup. Making the syrup wasn't difficult, but pouring into the entrance feeder made a huge mess. I could see it now, a swarm of bees infiltrate a house because of spilled sugar water. After I cleaned that up, I went outside to light the smoker. I have enough common sense to go outside at least. I didn't have any trouble lighting it the first time, but why won't it stay lit now? So, as I am trying to get the smoker lit, another dog comes over to bother Lucy. They end up in a tussle and I'm right in the middle of it and get a little bite on the leg. This is really going well. I make the trek out to the bees while scanning for copperheads. A friend had recommended "Beekeeping for Dummies", a helpful book, but stated that gloves are pretty much optional for installing a hive. I gathered my hive tool and started prying off the top. That first staple pulled out and I stopped what I was doing and put on my gloves. I'm glad I did. They say bees are nice and calm in the spring. I'm afraid to see them in the fall and winter. They were pissed. I sprayed them down the sugar water and smoked them. They were no longer calm as Hindu cows. As I was shaking them in to their new home, I realized that Lucy was getting stung. I stopped what I was doing and ran her back into the house. The whole time I'm thinking I need to get that epi-pen. (My doctor won't prescribe one over the phone and since I haven't seen her two years I need to come in on Monday.) She's o.k., so I went back out to finish up. I gingerly put the inner cover on and the top. There were still a lot of bees left in the mailing package, but hopefully they will find their way into the hive. I was stung once on the top of my head. I didn't feel it at the time. So, they are here. I'm very excited, but still a little nervous on this adventure!
Wednesday, March 14, 2012
Butcher block counters
I ordered maple butcher block counters for the kitchen island today from Lumber Liquidators and we will pick them in 10 days. IKEA has some, but the website always has them unavailable in the Dallas. We are still doing concrete around the perimeter. Also, we should have the kitchen sink and dishwasher hooked up by Friday. Little steps.
Monday, February 27, 2012
Welcome home
Last night we spent the night at the house for the first time. It was exactly how I had imagined it. Boxes everywhere, chaos and pure happiness. There are no words to describe the joy, pride and amazement I feel. I know I shouldn't love a house or material objects, but this house is a result from our dreams and hard work. There is still alot to accomplish, but we will get there. Good things take time.
Tuesday, February 21, 2012
U-haul Orange
There is so much to do, but even the littlest achievements are celebrated. They are all little in themselves, but makeup the big projects. You know the saying, "You can't see the forest, for the trees"? Sort of like that, but I'm starting to see the forest. Although, my favorite saying was something Pop said at the beginning of this project, "It's like eating an elephant, one bite at a time." The bites this weekend included: one microwave installed, one bathroom shower tiled and one wall grouted (just in time for the plumber), the pump house walls being prepped for studs, part of a storage unit unloaded (including the dishwasher, washer and dryer), two trips to Lowe's, one trip to Caldwell Hardware for another grout float, a cub scout outing to Entergy park, and finding the perfect accent color I've been looking for. It went something like this....



These are from Arkansas's own Tobi Fairley:
Me: Adam! Come here!
Adam: What?! (Sounding somewhat concerned)
Me: The dolly, that is the perfect shade of orange! Look at how well it goes with the green lights and is so happy with the wall and cabinet color!
Adam: The U-haul dolly? U-haul orange? Really? I can just see us going into the paint store. Yes, I'd like a gallon of U-haul orange, semi-gloss. Oh, it is a proprietary color....well, can you color match it? (with a great sarcastic tone)
Take a peek at these from http://fashionablyliving.com/ No sources were given.
Not to much, just a pop of color!



These are from Arkansas's own Tobi Fairley:
Adam and I went to the Energy Efficient House in Diamondhead a few years ago and I have been smitten with Tobi ever since.
Adam picked up some electrical insulators at Habitat last week! I had no idea what we were going to do with them, but since Tobi used them in a little vignette, it gives me the perfect excuse to bring out all of my Harry Potter books and disguise them!
So, there is this weekend's update. Hopefully, we will be able to report back soon that we have a working toilet. Stay tuned....
Friday, February 17, 2012
moving right along...
Our last update was in December. How terrible is that? Considering we (and all our sub-contractors) took the month of December off, there wasn't much to report on. January consisted of us getting our ducks in a row and figuring how much money we have left to finish up this project. That was fun.
This picture was taken on Feb. 14th. Adam is cooking pizza in our new oven. Take a peek at the farmhouse sink! And those cabinets- swoon! We ordered seeded glass to go in the upper cabinets yesterday, they will be beautiful! We decided to go with an oil-based paint for the cabinets. I know, all the other paint in the house has been no VOC, so I'm sure it just canceled each other out. We chose to do an oil-based paint for the durability and cleanliness factor. Lacquer would have been just as stinky and we wanted something that will hold up. Paint color is Front Porch by Sherwin-Williams. It is a light gray with cool blue undertones. The back splash will be carrera marble in subway tile.
We are so stinkin' close to finishing, but I also realize that we probably will never be done. It will always be a work in progress and I'm o.k. with that.
The list of things to do and completed projects:
-HVAC- 99.9% complete-they left off a vent cover.
-Electrical- 98% complete- they haven't installed a light in the boy's bath and put in the wrong breaker for our radiant floor.
-Plumbing- 50% complete- Plumber will be there on Tuesday to finish up.
-Adam installed a cork floor upstairs. He only banged his thumb twice and just a little blood.
-Master bath tile is complete and OH MY GOODNESS! That will deserve it's own post. It turned out amazing and I can't believe that's our bathroom. The frameless glass shower enclosure was ordered and should be installed in about 2 weeks. We are having an issue with the tub spout not being long enough.
-We need countertops and door hardware. We plan on pouring concrete countertops soon. The island will most likely be butcher block.
-Oven and refrigerator are installed
-We have doors installed upstairs, but no door knobs. Of course, I found beautiful, vintage glass doorknobs. But to use them, we need a retrofit kit. Also, we need sliding barn door kits for the doors downstairs.
-We are going to finish tiling the boy's shower this weekend.
-Touch up paint- lot's of that.
-Finish painting the kitchen island. I had hoped to stain it a weathered gray, but after numerous attempts and it looking like a purple hippo, we are painting it our trim color, Greek Villa from Sherwin-Williams.
-Painting the trim
-Garage Doors
- And much more..... But that's all I care to think about!
So, the question everyone has been asking, "When are you moving in?" NEXT WEEKEND! As soon as we have a toilet, a shower and a sink! Sure, we have alot to accomplish, but I think it will go faster once we are able to spend significant time there and I hope we will be able to work once the boys go to bed! Thanks for all of your support and we can't wait to move in!
Monday, December 12, 2011
Day 185ish
Today, Briana and I worked on the concrete floors! Cleaning and rinsing and acid etching and rinsing and rinsing and shopvaccing and sealing. The first coat of sealer is on in the laundry room, mud room, kitchen, pantry and tv area. I'll get a second coat in all those rooms and a first coat on some of the other areas. Saturday and Sunday I built the front patio roof and stalled the metal roof. It looks great! Another thing I did today was make all the connections for the radian floor system. I will fill it and purge it tomorrow. Then all we need is power and we can start heating the floor. We have been running the wood stove when we are out there. It gets pretty toasty! I'll post some pictures when I get them loaded from my phone.
A
A
Tuesday, November 29, 2011
Day 172ish
A lot has been happening at the house since the last post. Elec, plumbing and HVAC got roughed in. Sheet rock is done. I'll start spraying the inside walls today if I get out of work on time.
My dad I put most of the tile backer board up Sunday. The wood stove is installed and ready for a fire, but it's covered in plastic to prevent overspray. When the walls are painted we'll fire it up.
The septic lines are in. Just no tank yet. Hopefully this week. Power will be connected to the house by 12/2!
My dad I put most of the tile backer board up Sunday. The wood stove is installed and ready for a fire, but it's covered in plastic to prevent overspray. When the walls are painted we'll fire it up.
The septic lines are in. Just no tank yet. Hopefully this week. Power will be connected to the house by 12/2!