Day 29 - Concrete



Concrete was poured on the garage and shop today.  The back patio was also formed up to get ready to pour that and the breezeway tomorrow.  We are still working on the house area getting all the insulation in place.  It will be ready to pour early next week.

I tasted our well water today.  It tastes a lot like the water in town, only without the hint of chlorine.  So I guess that makes it even better. AND I don't have any GI problems yet as a result.  We are going to have it tested to see what kind of filtration we will need.

I also finished installing all the radiant heat floor PEX pipe.