Saturday, June 25, 2011

Day 17 - Block..... .....DONE!


The block is all closed up, and I must say I'm impressed with the precision of the block work.  We measured to double check before ordering the SIP panels.  The largest discrepancy was on a 42 foot wall that was 3/8" short.  Another wall a 1/4" short and everything else was spot on!  I would say that's about as good as it could have been done.  Our block master is Virgil Ellison.  If you need block let me know and I'll gladly give you his contact information.  
Some other happenings this week:
  • Septic is laid out but not installed
  • Well location is spotted and should be drilled in the coming week
  • Trusses and beams are priced and ready to be ordered when needed
Things we have in storage ready to be installed besides all our stuff we had previously:
  • Front door
  • door bell - vintage knob-turn bell. See picture below but it's satin nickel (my gift to B for our 10th anniversary)
  • All windows except 2 (from window mart miss measured pile $75 each)
  • kitchen sink and faucet - $20 for sink and $89 for awesome ebay faucet find
  • sinks for boys bathroom - $30 for both
  • several light fixtures: vintage porcelain gas station lights, chandelier for dining room
  • garage doors - 2 nine foot insulated garage door obtained lawfully for free!
  • dishwasher and water heater (for shop area)
  • rock climbing holds for access to kids cave(more info to come) Exciting!
  • sink for 1/2 bath
  • Ceiling fan for living room
  • cool old doors salvaged for interior sliding barn doors
  • screen door for side entry
  • Cool door knob from Anthropology clearance shelf for interior door somewhere $7!
  • Radiant heat flooring system is at B's shop and will be installed under slab very soon.  This week!